NEW QUESTION # 22
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question.
- A. PARDIST_SHD
- B. TABIM UPG
- C. PARMVNT_UPG
- D. TABIM_SHADOW_INC
Answer: B,C
NEW QUESTION # 23
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?
- A. Migration Hub
- B. Central Instance
- C. Transition Server
- D. Migration Server
Answer: D
NEW QUESTION # 24
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
- A. There are 40 R3load processes used for copying and 40 R3load processes for table count verification.
- B. These are 40 pairs of R3load processes, so there are 80 R3load processes running
- C. SUM is still running in uptime; the 40 defined R3load processes are considered.
- D. Without table contents comparison, only 40 R3load processes are being started.
Answer: B
NEW QUESTION # 25
Which preoperational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Perform the custom code adjustment.
- B. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
- C. Install add-on SAP Gateway 7.50.
- D. Delete client 066 (Early-Watch client).
Answer: B,D
NEW QUESTION # 26
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column.
What does the Calculated level indicate for those software components?
- A. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
- B. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
- C. The SAP Support Packages that will be bound to the conversion
- D. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner
Answer: A
NEW QUESTION # 27
What is the benefit of using the UPGANAXML file from a previous SUM run?
- A. To auto-fill specific fields on selected screens on the SUM UI
- B. To skip selected phases during the SUM run
- C. To make the progress information within SUM UI more accurate
- D. To repeat specific phases during the SUM run
Answer: C
NEW QUESTION # 28
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.
- A. You can verify that the content of the download directory matches the stack XMML file.
- B. You can find the optimal number of parallel R3load processes by monitoring host performance.
- C. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.
- D. You can record the modification adjustment during migration and use the transports in the next runs.
Answer: B,C
NEW QUESTION # 29
You are running an SAP ECC system .
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.
- A. Use DMO for SUM.
- B. Perform an SAP S/4HANA conversion without DMO.
- C. Upgrade the SAP system.
- D. Apply SAP Support Packages.
- E. Perform an SAP S/4HANA conversion including DMO.
Answer: A,C,D
NEW QUESTION # 30
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for thee last time?
- A. At the end of the downtime
- B. Before the downtime starts
- C. Early in the downtime
- D. As part of the cleanup process
Answer: B
NEW QUESTION # 31
You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this question.
- A. In DMO Migration Preparation
- B. In SUM Analysis
- C. In SUM Parameters
- D. In Process Control Center
Answer: C,D
NEW QUESTION # 32
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. SAP S/4HANA Server 2022
- B. SAP ECC system from SAP ERP 6.0 EHP 8
- C. Standalone AS ABAP with SAP BASIS 752
- D. SAP Solution Manager 7.2
Answer: A,C
NEW QUESTION # 33
You want to perform an SAP S/4HANA conversion using SUM with in place DMO.
Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correct answers to this question.
- A. Import of upgrade and language data from the download directory in phase TAABIM UPG
- B. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB
- C. Creation of application tables in the SAP HANA database in phase
- D. Activation of dictionary objects in phase ACT_UPG
- E. Import of dictionary objects from the download directory in phase DDIC_UPG
Answer: A,D,E
NEW QUESTION # 34
You have selected "Standard" as scenario strategy in the SUM tool.
Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.
- A. Modification adjustment (SPAU)
- B. Activation of dictionary objects (ACT_UPG)
- C. Conversion of application tables (PARCONV_UPG)
- D. Modification adjustment (SPDD)
Answer: B,D
NEW QUESTION # 35
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A.
- B.
- C.
- D.
- E.
Answer: B,C,E
NEW QUESTION # 36
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Database migration
- B. Unicode conversion
- C. Custom code analysis
- D. Software update
Answer: A,D
NEW QUESTION # 37
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. You need an SAP system based on AS ABAP 7.52 or above for the SI check framework.
- B. The Si checks are executed in the development system and the results are transported into the subsequent systems.
- C. You need to build up an SI check framework by applying SAP Notes.
- D. The errors from the SI checks must be solved; otherwise, SUM will report an error.
Answer: C,D
NEW QUESTION # 38
......